WHAT WE PROVIDE
Potable water is foundational to deployed site operations—supporting drinking water needs, and hygiene operations. CPR coordinates potable water support with an emphasis on reliability, replenishment planning, and integration with showers and feeding operations.
Potable water support may include (scope dependent):
• Water supply coordination (source planning and delivery scheduling)
• Replenishment schedules aligned to headcount and usage patterns
• Storage/distribution planning support (where applicable)
• Integration planning with:
– Mobile showers & hygiene
– Site support management and reporting
INDUSTRY-STANDARD PLANNING CONSIDERATIONS
• Daily consumption requirements vary by climate, work type, and duration
• Peak demand matters (morning/evening and meal periods can create spikes)
• Storage and distribution must match site constraints (space, access, ground conditions)
• Water planning must align with sanitation and wastewater plans to keep the site functional
WHAT WE NEED FROM YOU
• Location(s)
• Headcount and shift schedule
• Duration of operations
• Planned shower service operations (these impact demand)
• Site access for delivery and storage placement constraints
• Any contract requirements for reporting/documentation
APPLICABLE CONTRACTING CODES
NAICS: 561210, 561990
FAQs
Q: Can water support be provided as part of turnkey base camp services?
A: Yes—water is frequently scoped together with showers, and wastewater planning.
Q: How do you determine replenishment schedules?
A: We plan replenishment based on headcount, peak usage, operational tempo, and the services being supported (showers/feeding).
READY TO PLAN POTABLE WATER SUPPORT?
Send your location, headcount, and duration, plus whether showers/feeding are part of the deployment. CPR will propose a replenishment and integration plan.
GET STARTED TODAY